Iron DustTurnoverIron Dust Turnovers Ltd.

Projects

Work we can show you

Real projects, photographed at site condition and again at handover. No stock imagery and no borrowed case studies — this page grows as jobs are documented and clients approve sharing them.

P-01Residential

Basement suite — final construction clean

A newly developed basement suite taken from site condition to handover. We came in behind the trades once flooring and cabinetry were in: construction dust off ceilings, bulkheads, walls and trim; protective film, adhesive and labels removed from cabinetry, appliances and glass; egress windows, tracks and sills cleaned; and the new vinyl plank floor washed and finished for the walkthrough.

Location
Calgary, AB
Scope
Final construction clean
Outcome
Suite handed over clean and ready for the client walkthrough.
Finished basement living area with new vinyl plank flooring, clean white walls and recessed lighting, ready for handover.

Site condition / handover

Room by room

Drag the amber edge on any of these, or focus the handle and use the arrow keys.

  • The same basement living area at handover: vinyl plank flooring down, floor and walls cleaned, room empty and ready for occupancy.
    Basement living area at site condition: bare concrete floor with construction debris, offcuts and dust, appliance still standing in the room.

    C-01Living area

  • The same egress window after cleaning, with glass, frame, track and sill clear and daylight coming through.
    Basement egress window at site condition, glass and frame covered in construction dust and residue.

    C-02Egress window

  • The same basement bedroom at handover, with vinyl plank flooring, cleaned walls, window and baseboards.
    Basement bedroom at site condition: bare concrete subfloor, dust across the walls and window.

    C-03Bedroom

  • The same suite kitchen at handover: film removed, cabinets, counters and appliance fronts cleaned, floor finished.
    Suite kitchen at site condition: cabinetry still wrapped in protective film, packaging and offcuts on a bare floor.

    C-04Kitchen

Site-condition photographs were taken while the build was still in progress. Flooring, cabinetry and finishes were completed by the trades — our work is the final clean that took the suite from that state to handover.

More from this project

  • Finished basement bedroom with closet doors, egress window and new flooring, cleaned for handover.
    Second bedroom, at handover
  • Cleaned suite stairwell and landing with handrail, painted walls and finished stair treads.
    Stairwell and suite entry
  • Utility area during construction with shop vacuums, tools and dust across a bare concrete floor.
    Utility area, site condition
  • Storage room during construction with packaging and offcuts left on a bare concrete floor.
    Storage room, site condition
  • Suite landing during construction with debris on the floor and dust across the walls and stair opening.
    Landing, site condition

More projects to come

Every project on this page is one we actually completed, shown with the client’s permission. As more jobs are photographed they get added here — if you would like to see work closer to your own project type, ask and we will tell you honestly what we have done.

Ready for handover

Is your project ready for its final clean?

Send the details and we will come back with a scope and a price. If the date is tight, call — that is usually faster.